Al-Badr albadr Company contracted to carry out the civil works in these two facilities only, and the work began from excavation and filling to the  concrete works. Our company  provided:

Project manager  1

3 civil engineer and 2 survey engineer

With a foreman  2

And the number of workers in the two projects reaches 35 workers

Central Library

Central Library

Central Library This library

Central Library

Central Library

This library was designed for the clay stone on which it was written in the cuneiform language, in the so-called Hammurabi obelisk. This project is located in the Muthanna Governorate, south of Baghdad. The total cost of this project is 12,000,000. Our company has carried out all the works related to this project

From excavation and backfilling to finishing works

Our company provided for this project a team consisting of

1- Project manager

A civil engineer, mechanical…

AL AMERAT PROJECT

AL AMERAT PROJECT

AL AMERAT PROJECT Rods

AL AMERAT PROJECT

AL AMERAT PROJECT

Rods for 125,000m2 and thickness 15cm arrive to 19,688 with loses type C25 House for 3000 unit
 Foundation 150m2 *30cm =45m3 with loses 47.25m3 total quantity for 3000 units 141,750m3
 Slap: 170m2 *15cm =25.5 with loses 26.8 for all 3000 units 80,325
 Total quantity for this project is 241,763

NASRIYA BS2 CPP

NASRIYA BS2 CPP

NASRIYA BS2 CPP 

NASRIYA BS2 CPP

NASRIYA BS2 CPP

 type C30 for 7 tank each tank has 1200 piles and we supply for one piles 12m3 All quantity for 7 tank arrive to 100,800m3.
 concert for tank for many type C10, C25, C30& C35 and all quantity arrive to 4000 m3 approximately with loses and for 7 tank our quantity arrives to 39,599 m3.
 pipe support work arrives to 11,000 m3.
 T-wall work for 5000 T-walls 8,750m3.
 more than 45…

Preparation of work

Preparation of work

Preparation of work 1.

Preparation of work

Preparation of work

1. Locate a designated area for the installation of molds and casting.
2. Clean and Level the located area to prepare it in order to cast lean concrete layer to install the steel form.
3. Casting the lean concrete layer to install the steel forms.

KARBALAA PROJECT

KARBALAA PROJECT

KARBALAA PROJECT At an

KARBALAA PROJECT

KARBALAA PROJECT

At an accelerated pace and diligent work, Al-Bader Towers Company has completed the construction and rehabilitation of the Karbala warehouse and the industrial projects located on the road linking Najaf and the holy Karbala to develop and expand future projects and facilities belonging to the Abbasid shrine, where the completion rates reached (100%).
We learned that the projects implemented by our company amounted to (15) warehouses and workshops distributed in various regions. In the…

ZHENHUA

ZHENHUA

  project in Baghdad,

ZHENHUA

 

project in Baghdad, oil fields east of
Baghdad, was prepared after
contracting with the Chinese
company ZHENHUA to establish
temporary facilities for the camp, as
the project was completed within
the required period according to
international specification s after
examination and scrutiny by the
Chinese company, as well as building
workshops and some offices for
temporary facilities. Work
progressed according to the planned

IMAM ABBAS HOLY SHRIN

IMAM ABBAS HOLY SHRIN

IMAM ABBAS HOLY SHRIN

IMAM ABBAS HOLY SHRIN

IMAM ABBAS HOLY SHRIN

At an accelerated pace and diligent work, Al-Bader Towers Company
has completed the construction and rehabilitation of the Karbala warehouse
and the industrial projects located on the road linking Najaf and the holy
Karbala to develop and expand future projects and facilities belonging to the
Abbasid shrine, where the completion rates reached (100%).
We learned that the projects implemented by our company amounted to
(15) warehouses and workshops distributed in various regions. In the holy
Karbala governorate, with…

CPP Project

CPP Project

  A project in

CPP Project

 

A project in the city of Nasiriyah affiliated with the Chinese CPP company was equipped with a number of caravans for the managers, supervisors and engineers and workers in the project, as the project was prepared according to international specifications and within a standard period the work was completed and the full number of temporary facilities was supplemented as indicated in the attached contract