AL AMERAT PROJECT
Rods for 125,000m2 and thickness 15cm arrive to 19,688 with loses type C25 House for 3000 unit
Foundation 150m2 *30cm =45m3 with loses 47.25m3 total quantity for 3000 units 141,750m3
Slap: 170m2 *15cm =25.5 with loses 26.8 for all 3000 units 80,325
Total quantity for this project is 241,763