station & Control room
Al-Badr albadr Company contracted to carry out the civil works in these two facilities only, and the work began from excavation and filling to the concrete works. Our company provided:
Project manager 1
3 civil engineer and 2 survey engineer
With a foreman 2
And the number of workers in the two projects reaches 35 workers
Central Library
This library was designed for the clay stone on which it was written in the cuneiform language, in the so-called Hammurabi obelisk. This project is located in the Muthanna Governorate, south of Baghdad. The total cost of this project is 12,000,000. Our company has carried out all the works related to this project
From excavation and backfilling to finishing works
Our company provided for this project a team consisting of
1- Project manager
A civil engineer, mechanical…
AL AMERAT PROJECT
Rods for 125,000m2 and thickness 15cm arrive to 19,688 with loses type C25 House for 3000 unit
Foundation 150m2 *30cm =45m3 with loses 47.25m3 total quantity for 3000 units 141,750m3
Slap: 170m2 *15cm =25.5 with loses 26.8 for all 3000 units 80,325
Total quantity for this project is 241,763
NASRIYA BS2 CPP
type C30 for 7 tank each tank has 1200 piles and we supply for one piles 12m3 All quantity for 7 tank arrive to 100,800m3.
concert for tank for many type C10, C25, C30& C35 and all quantity arrive to 4000 m3 approximately with loses and for 7 tank our quantity arrives to 39,599 m3.
pipe support work arrives to 11,000 m3.
T-wall work for 5000 T-walls 8,750m3.
more than 45…
Preparation of work
1. Locate a designated area for the installation of molds and casting.
2. Clean and Level the located area to prepare it in order to cast lean concrete layer to install the steel form.
3. Casting the lean concrete layer to install the steel forms.
KARBALAA PROJECT
At an accelerated pace and diligent work, Al-Bader Towers Company has completed the construction and rehabilitation of the Karbala warehouse and the industrial projects located on the road linking Najaf and the holy Karbala to develop and expand future projects and facilities belonging to the Abbasid shrine, where the completion rates reached (100%).
We learned that the projects implemented by our company amounted to (15) warehouses and workshops distributed in various regions. In the…
project in Baghdad, oil fields east of
Baghdad, was prepared after
contracting with the Chinese
company ZHENHUA to establish
temporary facilities for the camp, as
the project was completed within
the required period according to
international specification s after
examination and scrutiny by the
Chinese company, as well as building
workshops and some offices for
temporary facilities. Work
progressed according to the planned